Evaluation of the Critical risk factors in PPP - procured Mass Housing Projects in Abuja Nigeria - A fuzzy synthetic evaluation (FSE) approach

1
Department of Quantity Surveying, Federal University of Technology, Akure, Nigeria
Page(s): 58-85
Received
January 29, 2023
Revised
March 20, 2023
Accepted
April 26, 2023
Published
April 27, 2023
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.
Copyright: Copyright © The Author(s), 2023. Published by Scientific Publications
Article metrics
Views
515
Downloads
171

Cite This Article

APA Style
Temitope, A. B. , Emmanuel, O. A. , & Olaniyi, A. I. (2023). Evaluation of the Critical risk factors in PPP - procured Mass Housing Projects in Abuja Nigeria - A fuzzy synthetic evaluation (FSE) approach. Global Journal of Cardiovascular Diseases, 2(1), 58-85. https://doi.org/10.31586/wjcea.2023.605
ACS Style
Temitope, A. B. ; Emmanuel, O. A. ; Olaniyi, A. I. Evaluation of the Critical risk factors in PPP - procured Mass Housing Projects in Abuja Nigeria - A fuzzy synthetic evaluation (FSE) approach. Global Journal of Cardiovascular Diseases 2023 2(1), 58-85. https://doi.org/10.31586/wjcea.2023.605
Chicago/Turabian Style
Temitope, Arijeloye Bamidele, Oke Ayodeji Emmanuel, and Aje Isaac Olaniyi. 2023. "Evaluation of the Critical risk factors in PPP - procured Mass Housing Projects in Abuja Nigeria - A fuzzy synthetic evaluation (FSE) approach". Global Journal of Cardiovascular Diseases 2, no. 1: 58-85. https://doi.org/10.31586/wjcea.2023.605
AMA Style
Temitope AB, Emmanuel OA, Olaniyi AI. Evaluation of the Critical risk factors in PPP - procured Mass Housing Projects in Abuja Nigeria - A fuzzy synthetic evaluation (FSE) approach. Global Journal of Cardiovascular Diseases. 2023; 2(1):58-85. https://doi.org/10.31586/wjcea.2023.605
@Article{gjcd605,
AUTHOR = {Temitope, Arijeloye Bamidele and Emmanuel, Oke Ayodeji and Olaniyi, Aje Isaac},
TITLE = {Evaluation of the Critical risk factors in PPP - procured Mass Housing Projects in Abuja Nigeria - A fuzzy synthetic evaluation (FSE) approach},
JOURNAL = {Global Journal of Cardiovascular Diseases},
VOLUME = {2},
YEAR = {2023},
NUMBER = {1},
PAGES = {58-85},
URL = {https://www.scipublications.com/journal/index.php/WJCEA/article/view/605},
ISSN = {2836-4511},
DOI = {10.31586/wjcea.2023.605},
ABSTRACT = {The study accessed the critical risk factors in public-private partnership (PPP)-procured mass housing project (MHP) delivery in Nigeria. The research design adopts a quantitative approach, using well-structured questionnaires distributed to stakeholders involved in PPP-MHPs i.e. consultants, in-house professionals, contractors, and the organized private sector (OPS) registered with PPP departments in the Federal Capital Territory Development Authority (FCDA) Abuja, Nigeria. The instrument relates to the background information of respondents and the risk peculiar to PPP-MHP. Sixty-three (63) risk factors were submitted for the respondents to rank using Mean Item score (MIS) for risk occurrence and its severity, while risk significance index (RI) was used to determine the risk impact. Fuzzy Synthetic Evaluation (FSE) method was subsequently applied to determine the risk criticality groups and the overall risk level in the sector. The fuzzy set theory deals with ambiguous, subjective and imprecise judgments peculiar to decision making in construction project risk assessment. It aims to provide a synthetic evaluation of an object relative to a fuzzy decision environment with multiple criteria that requires qualitative linguistic terms. The findings show that thirty-one (31) risk factors were critical in the sector while financial and micro-economic risk group is contributing most significantly to the overall risk level in PPP-MHPs in Nigeria. The top 10 risk factors in the sector include availability of finance, high finance cost, the unstable value of the local currency, lack of creditworthiness, influential economic events (boom/recession), high bidding cost, poor financial market, financial attraction to project investors, interest rate volatility, inflation rate volatility, corruption and lack of respect for the law, non-involvement of the host community and poor execution of housing policies. The implication for practice is that having known the risk group contributing most significantly to the overall risk level in PPP-MHPs, adequate financial and budgetary allocation should be made available before embarking on such venture so as to sustain the scheme in the country. The study is one of the recent researches conducted on housing, since the procurement option is novel in the sector. The study is of immense value to PPP actors in providing necessary information required to formulate risk response methods in minimize the identified risk impact sector.},
}
%0 Journal Article
%A Temitope, Arijeloye Bamidele
%A Emmanuel, Oke Ayodeji
%A Olaniyi, Aje Isaac
%D 2023
%J Global Journal of Cardiovascular Diseases

%@ 2836-4511
%V 2
%N 1
%P 58-85

%T Evaluation of the Critical risk factors in PPP - procured Mass Housing Projects in Abuja Nigeria - A fuzzy synthetic evaluation (FSE) approach
%M doi:10.31586/wjcea.2023.605
%U https://www.scipublications.com/journal/index.php/WJCEA/article/view/605
TY  - JOUR
AU  - Temitope, Arijeloye Bamidele
AU  - Emmanuel, Oke Ayodeji
AU  - Olaniyi, Aje Isaac
TI  - Evaluation of the Critical risk factors in PPP - procured Mass Housing Projects in Abuja Nigeria - A fuzzy synthetic evaluation (FSE) approach
T2  - Global Journal of Cardiovascular Diseases
PY  - 2023
VL  - 2
IS  - 1
SN  - 2836-4511
SP  - 58
EP  - 85
UR  - https://www.scipublications.com/journal/index.php/WJCEA/article/view/605
AB  - The study accessed the critical risk factors in public-private partnership (PPP)-procured mass housing project (MHP) delivery in Nigeria. The research design adopts a quantitative approach, using well-structured questionnaires distributed to stakeholders involved in PPP-MHPs i.e. consultants, in-house professionals, contractors, and the organized private sector (OPS) registered with PPP departments in the Federal Capital Territory Development Authority (FCDA) Abuja, Nigeria. The instrument relates to the background information of respondents and the risk peculiar to PPP-MHP. Sixty-three (63) risk factors were submitted for the respondents to rank using Mean Item score (MIS) for risk occurrence and its severity, while risk significance index (RI) was used to determine the risk impact. Fuzzy Synthetic Evaluation (FSE) method was subsequently applied to determine the risk criticality groups and the overall risk level in the sector. The fuzzy set theory deals with ambiguous, subjective and imprecise judgments peculiar to decision making in construction project risk assessment. It aims to provide a synthetic evaluation of an object relative to a fuzzy decision environment with multiple criteria that requires qualitative linguistic terms. The findings show that thirty-one (31) risk factors were critical in the sector while financial and micro-economic risk group is contributing most significantly to the overall risk level in PPP-MHPs in Nigeria. The top 10 risk factors in the sector include availability of finance, high finance cost, the unstable value of the local currency, lack of creditworthiness, influential economic events (boom/recession), high bidding cost, poor financial market, financial attraction to project investors, interest rate volatility, inflation rate volatility, corruption and lack of respect for the law, non-involvement of the host community and poor execution of housing policies. The implication for practice is that having known the risk group contributing most significantly to the overall risk level in PPP-MHPs, adequate financial and budgetary allocation should be made available before embarking on such venture so as to sustain the scheme in the country. The study is one of the recent researches conducted on housing, since the procurement option is novel in the sector. The study is of immense value to PPP actors in providing necessary information required to formulate risk response methods in minimize the identified risk impact sector.
DO  - Evaluation of the Critical risk factors in PPP - procured Mass Housing Projects in Abuja Nigeria - A fuzzy synthetic evaluation (FSE) approach
TI  - 10.31586/wjcea.2023.605
ER  -