Article Open Access April 28, 2023

Evaluation of the Incidences of Risk Occurrence and Severity in PPP-Procured Mass Housing Projects (PPP-MHPs) in Abuja, Nigeria

1
Department of Quantity Surveying, Federal University of Technology, Akure, Nigeria
Page(s): 86-98
Received
January 30, 2023
Revised
March 16, 2023
Accepted
April 27, 2023
Published
April 28, 2023
Creative Commons

This is an Open Access article, distributed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits unrestricted use, distribution and reproduction in any medium or format, provided the original work is properly cited.
Copyright: Copyright © The Author(s), 2023. Published by Scientific Publications
Article metrics
Views
319
Downloads
174

Cite This Article

APA Style
Temitope, A. B. , Emmanuel, O. A. , & Olaniyi, A. I. (2023). Evaluation of the Incidences of Risk Occurrence and Severity in PPP-Procured Mass Housing Projects (PPP-MHPs) in Abuja, Nigeria. Global Journal of Cardiovascular Diseases, 2(1), 86-98. https://doi.org/10.31586/wjcea.2023.608
ACS Style
Temitope, A. B. ; Emmanuel, O. A. ; Olaniyi, A. I. Evaluation of the Incidences of Risk Occurrence and Severity in PPP-Procured Mass Housing Projects (PPP-MHPs) in Abuja, Nigeria. Global Journal of Cardiovascular Diseases 2023 2(1), 86-98. https://doi.org/10.31586/wjcea.2023.608
Chicago/Turabian Style
Temitope, Arijeloye Bamidele, Oke Ayodeji Emmanuel, and Aje Isaac Olaniyi. 2023. "Evaluation of the Incidences of Risk Occurrence and Severity in PPP-Procured Mass Housing Projects (PPP-MHPs) in Abuja, Nigeria". Global Journal of Cardiovascular Diseases 2, no. 1: 86-98. https://doi.org/10.31586/wjcea.2023.608
AMA Style
Temitope AB, Emmanuel OA, Olaniyi AI. Evaluation of the Incidences of Risk Occurrence and Severity in PPP-Procured Mass Housing Projects (PPP-MHPs) in Abuja, Nigeria. Global Journal of Cardiovascular Diseases. 2023; 2(1):86-98. https://doi.org/10.31586/wjcea.2023.608
@Article{gjcd608,
AUTHOR = {Temitope, Arijeloye Bamidele and Emmanuel, Oke Ayodeji and Olaniyi, Aje Isaac},
TITLE = {Evaluation of the Incidences of Risk Occurrence and Severity in PPP-Procured Mass Housing Projects (PPP-MHPs) in Abuja, Nigeria},
JOURNAL = {Global Journal of Cardiovascular Diseases},
VOLUME = {2},
YEAR = {2023},
NUMBER = {1},
PAGES = {86-98},
URL = {https://www.scipublications.com/journal/index.php/WJCEA/article/view/608},
ISSN = {2836-4511},
DOI = {10.31586/wjcea.2023.608},
ABSTRACT = {Risks in Public Private Procurement mass housing project (PPP-MHP) initiatives are emerging and this requires early risk identification and allocation to achieve the goal and sustenance of the scheme. The study, being a follow-up of a Delphi survey, elicits the opinion of respondents on the probability of occurrence and severity of identified risks in PPP-MHPs in Nigeria. The study adopts a quantitative research design approach by administering structure questionnaire survey on identified PPP-MHPs partners in Abuja, Nigeria. Data analysis was performed using descriptive and inferential statistical tools such as Mean item score (MIS), standard deviation, and Kruskal Wallis analytical techniques with the aid of SPSS software packages. The findings show that all the listed risk factors were found to be extremely high, very high, high, or moderate in terms of occurrence while all the listed risk factors recorded a very high level of severity on the delivery of PPP-MHPs. The top ten (10) risk factors frequently associated with PPP-MHPs are non-availability of finance, high finance cost, non-involvement of the host community, poor execution of housing policies, corruption and lack of respect for law, wrong perception of housing need by low-income earners, Illegal title to land, land acquisition and site availability, level of demand for the mass housing projects and unstable value of local currency. The respondents differs significantly on 29 risk factors in terms of occurrence and 40 risk factors in term of severity. The study, therefore, recommends that risk management culture should be highly encouraged among the PPP Partners in the sector. The study intends to enumerate the rate of occurrence of some itemized risk factors and their severities on the delivery of PPP – procured mass housing projects in Nigeria and the need to bookmark these risk factors in ensuring the sustainability of the PPP mass housing scheme.},
}
%0 Journal Article
%A Temitope, Arijeloye Bamidele
%A Emmanuel, Oke Ayodeji
%A Olaniyi, Aje Isaac
%D 2023
%J Global Journal of Cardiovascular Diseases

%@ 2836-4511
%V 2
%N 1
%P 86-98

%T Evaluation of the Incidences of Risk Occurrence and Severity in PPP-Procured Mass Housing Projects (PPP-MHPs) in Abuja, Nigeria
%M doi:10.31586/wjcea.2023.608
%U https://www.scipublications.com/journal/index.php/WJCEA/article/view/608
TY  - JOUR
AU  - Temitope, Arijeloye Bamidele
AU  - Emmanuel, Oke Ayodeji
AU  - Olaniyi, Aje Isaac
TI  - Evaluation of the Incidences of Risk Occurrence and Severity in PPP-Procured Mass Housing Projects (PPP-MHPs) in Abuja, Nigeria
T2  - Global Journal of Cardiovascular Diseases
PY  - 2023
VL  - 2
IS  - 1
SN  - 2836-4511
SP  - 86
EP  - 98
UR  - https://www.scipublications.com/journal/index.php/WJCEA/article/view/608
AB  - Risks in Public Private Procurement mass housing project (PPP-MHP) initiatives are emerging and this requires early risk identification and allocation to achieve the goal and sustenance of the scheme. The study, being a follow-up of a Delphi survey, elicits the opinion of respondents on the probability of occurrence and severity of identified risks in PPP-MHPs in Nigeria. The study adopts a quantitative research design approach by administering structure questionnaire survey on identified PPP-MHPs partners in Abuja, Nigeria. Data analysis was performed using descriptive and inferential statistical tools such as Mean item score (MIS), standard deviation, and Kruskal Wallis analytical techniques with the aid of SPSS software packages. The findings show that all the listed risk factors were found to be extremely high, very high, high, or moderate in terms of occurrence while all the listed risk factors recorded a very high level of severity on the delivery of PPP-MHPs. The top ten (10) risk factors frequently associated with PPP-MHPs are non-availability of finance, high finance cost, non-involvement of the host community, poor execution of housing policies, corruption and lack of respect for law, wrong perception of housing need by low-income earners, Illegal title to land, land acquisition and site availability, level of demand for the mass housing projects and unstable value of local currency. The respondents differs significantly on 29 risk factors in terms of occurrence and 40 risk factors in term of severity. The study, therefore, recommends that risk management culture should be highly encouraged among the PPP Partners in the sector. The study intends to enumerate the rate of occurrence of some itemized risk factors and their severities on the delivery of PPP – procured mass housing projects in Nigeria and the need to bookmark these risk factors in ensuring the sustainability of the PPP mass housing scheme.
DO  - Evaluation of the Incidences of Risk Occurrence and Severity in PPP-Procured Mass Housing Projects (PPP-MHPs) in Abuja, Nigeria
TI  - 10.31586/wjcea.2023.608
ER  -