A framework for evaluation of improvement opportunities for environmental impacts on construction works using life cycle assessment and value stream mapping concepts: offsite and onsite building construction

Table 3.

Equipment information –Onsite construction*Adapted from [72]

Description

Equipment information

Name of equipment

Round trip distance for mobilization and demobilization of equipment to and from the site

Type of vehicle used to bring equipment to the site

Energy source for the equipment

Power rating for equipment (W)

If fossil fuel, how many liters per hour of fuel does the equipment use

Total hours to complete this section of project

Get Permits and Kick off project

Plot Plan & Stake-Out (Main building and garage)

XYZ Equip 1

XYZ Equip 2

XYZ Equip 3

Connect Temporary Power

Excavation

Shoring operation

Footings

Inspection: Footings / Steel

Foundation

Inspection: Foundation / Steel

Waterproof Foundation

Flatwork: Basement & Garage

Flatwork: Outside

Backfill & Rough Grade

Framing (Floors, walls, stairs, decks and entire skeletal structure of the building

Roofing

Rough Plumbing

HVAC Rough

Electric Rough

Insulation

Drywall Hang

Interior and exterior handrails