Distributed Generation and Optimization of smart Grid Systems: Case Study of Kumba in Cameroon
Table 2.
Load point outputof DG
|
| Component |
Average interruption rate |
Average outage duration |
Annual outage duration |
|
|
| ID |
f/yr |
hr |
hr/yr |
|
|
| Distribution line |
0.020 |
5.00 |
0.0100 |
|
| Distribution line breaker |
1.670 |
0.25 |
0.4175 |
|
| Transformer |
0.020 |
4.00 |
0.0800 |
|
| Inverter |
0.067 |
2.00 |
0.1340 |
|
|
|
|