Evaluation of the Critical risk factors in PPP - procured Mass Housing Projects in Abuja Nigeria - A fuzzy synthetic evaluation (FSE) approach

Table 8.

Risk indices and Ranking of CRFG in PPP-procured Mass Housing Projects

Index Linguistic Index Linguistic Index Linguistic

Financial and Macroeconomic risk (CRFG 1): u1 5.76 Very High 5.63 Very High 5.69 Very High 1
Legal and Socio-political risk (CRFG 2): u2 5.28 High 5.67 Very High 5.47 High 4
Operation and Organization risk (CFRG 3): u3 5.56 High 5.65 Very High 5.60 Very High 3
Design and Project Selection risk (CRFG 4): u4 5.69 Very High 5.65 Very High 5.67 Very High 2
Construction risk (CRFG 5): u5 5.27 High 5.60 Very High 5.43 High 5
Overall risk level (ORL) of PPP mass housing 5.70 Very High 5.60 Very High 5.65 Very High