Evaluation of the Critical risk factors in PPP - procured Mass Housing Projects in Abuja Nigeria - A fuzzy synthetic evaluation (FSE) approach
World Journal of Civil Engineering and Architecture
| Vol 2, Issue 1
Table 8. Risk indices and Ranking of CRFG in PPP-procured Mass Housing Projects
| Index | Linguistic | Index | Linguistic | Index | Linguistic | ||
| Financial and Macroeconomic risk (CRFG 1): u1 | 5.76 | Very High | 5.63 | Very High | 5.69 | Very High | 1 |
| Legal and Socio-political risk (CRFG 2): u2 | 5.28 | High | 5.67 | Very High | 5.47 | High | 4 |
| Operation and Organization risk (CFRG 3): u3 | 5.56 | High | 5.65 | Very High | 5.60 | Very High | 3 |
| Design and Project Selection risk (CRFG 4): u4 | 5.69 | Very High | 5.65 | Very High | 5.67 | Very High | 2 |
| Construction risk (CRFG 5): u5 | 5.27 | High | 5.60 | Very High | 5.43 | High | 5 |
| Overall risk level (ORL) of PPP mass housing | 5.70 | Very High | 5.60 | Very High | 5.65 | Very High | |