Integrated GIS and geotechnical assessment of the stability of the Oued Ayda dike (Kesra Siliana, Tunisia)
World Journal of Geomatics and Geosciences
| Vol 5, Issue 1
Table 2. Safety factors obtained for the upstream and downstreamslopes at the different phases of hydromechanical analysis.
| Phase | Safety factor (SF) | |||
| Short term | Long term | |||
| Talus Amont | Talus Aval | Talus Amont | Talus Aval | |
| Construction | 3,961 | 3,198 | ||
| Filled (FN) | 5,187 | 3,298 | 3,133 | 1,335 |
| Quick Drain | 3,625 | 3,341 | 2,023 | 1,333 |
| Empty | 2,253 | 1,338 | ||