Back to Article

Distributed Generation and Optimization of smart Grid Systems: Case Study of Kumba in Cameroon

World Journal of Electrical and Electronic Engineering | Vol 1, Issue 1

Table 2. Load point outputof DG

ComponentAverage interruption rateAverage outage durationAnnual outage duration
IDf/yrhrhr/yr

Distribution line0.0205.000.0100
Distribution line breaker1.6700.250.4175
Transformer0.0204.000.0800
Inverter0.0672.000.1340