A framework for evaluation of improvement opportunities for environmental impacts on construction works using life cycle assessment and value stream mapping concepts: offsite and onsite building construction
Table 2. Material delivery information– onsite construction * Adapted from [72]
| Description | Material delivery Information | ||||||
| Type of delivery vehicle | Round trip distance for material delivery (Km) | Number of trips for material delivery | Name of vehicle for material delivery | Type of energy source for material transport | Energy use rate per kilometer for material delivery (liters/km) | What other material for the project is included in this delivery | |
| Get Permits and Kick off project | |||||||
| Plot Plan & Stake-Out (Main building and garage) | |||||||
| XYZ Vehicle 1 | Brand name for Veh. 1 | ||||||
| XYZ Vehicle 2 | Brand name for Veh. 2 | ||||||
| Connect Temporary Power | |||||||
| Excavation | |||||||
| Shoring operation | |||||||
| Footings | |||||||
| Inspection: Footings / Steel | |||||||
| Foundation | |||||||
| Inspection: Foundation / Steel | |||||||
| Waterproof Foundation | |||||||
| Flatwork: Basement & Garage | |||||||
| Flatwork: Outside | |||||||
| Backfill & Rough Grade | |||||||
| Framing (Floors, walls, stairs, decks and entire skeletal structure of the building | |||||||
| Roofing | |||||||
| Rough Plumbing | |||||||
| HVAC Rough | |||||||
| Electric Rough | |||||||
| Insulation | |||||||
| Drywall Hang | |||||||
| Interior and exterior handrails | |||||||