A framework for evaluation of improvement opportunities for environmental impacts on construction works using life cycle assessment and value stream mapping concepts: offsite and onsite building construction
Table 3. Equipment information –Onsite construction*Adapted from [72]
| Description | Equipment information | ||||||
| Name of equipment | Round trip distance for mobilization and demobilization of equipment to and from the site | Type of vehicle used to bring equipment to the site | Energy source for the equipment | Power rating for equipment (W) | If fossil fuel, how many liters per hour of fuel does the equipment use | Total hours to complete this section of project | |
| Get Permits and Kick off project | |||||||
| Plot Plan & Stake-Out (Main building and garage) | XYZ Equip 1 | ||||||
| XYZ Equip 2 | |||||||
| XYZ Equip 3 | |||||||
| Connect Temporary Power | |||||||
| Excavation | |||||||
| Shoring operation | |||||||
| Footings | |||||||
| Inspection: Footings / Steel | |||||||
| Foundation | |||||||
| Inspection: Foundation / Steel | |||||||
| Waterproof Foundation | |||||||
| Flatwork: Basement & Garage | |||||||
| Flatwork: Outside | |||||||
| Backfill & Rough Grade | |||||||
| Framing (Floors, walls, stairs, decks and entire skeletal structure of the building | |||||||
| Roofing | |||||||
| Rough Plumbing | |||||||
| HVAC Rough | |||||||
| Electric Rough | |||||||
| Insulation | |||||||
| Drywall Hang | |||||||
| Interior and exterior handrails | |||||||